当前位置: > 媒体中心

联系恒兴业CONTACT US

客户服务热线:0757-82209610
电话:0757-82209610/82207109
传真:0757-82201032
联系人:招焯活
手机:13702907340
邮箱:369995615@qq.com
网站:http://www.fshxy.com

Feasibility analysis of the sewage source heat pump used in the north

2013年9月5日 阅读:2176

the usefulness of air source heat pump in addition to the preparation of the career of hot water, like air conditioning the release of lump meet the needs of the room, and balcony or garage to reach the dehumidification effect, air source heat pump should Ruo to protect? Competence to carry forward the greatest results?

An air source heat pump water heater is the initiative of a high level of equipment, schedule for use when the unit form of self-examination, if a long and useful maintenance and protection of the unit, the unit running securely and use of life Du unexpected progress .

Reflect on the pump, waterway valve is whether the task properly, whether the leakage of water pipeline and pipe joints.

3, the outside device, waterway filter should be clean, clear waters, and the guarantee system to prevent the unit due to fouling of the filter to the formation of host damage.

Four, unit four weeks should insist on a clean dry, superior ventilation. Each year cleaning the air-side heat exchanger, to adhere to the superior heat transfer results.

5, air source heat pump water heater to constantly reflect whether strong unit power supply wiring and electrical systems, electrical components, ability to measure abnormal, if there should be real-time maintenance and change.

Often reflect on the replenishment of the water system, water tank safe valve, whether the normal level restraint and exhaust installation tasks, so as to avoid air entering the system to the formation of the water cycle of reduction, and then affect the unit's heating capacity and the unit operation of the solid.

分享到: